Contractor mode

Settings → Company Information → Company Type → Construction sets a company up the way a contractor keeps its books, the same way Nonprofit does for a ministry: one switch, no change to any data, reversible at any time. It is the counterpart to QuickBooks Desktop's Contractor Edition. Construction mode adds the contractor accounts, division/section cost codes, trade packages, a Sub vendor type, construction estimating, the contract and schedule of values, commitments, change orders, progress billing with retainage, and seven job reports. Every role reaches these screens; only payroll and HR are the administrator's alone.

The five starting cost types (labor, material, subcontract, equipment, other) appear in the Cost Types list once the company has saved something that uses them — construction setup, a new cost type or code, or a costed line; a read alone never saves them (2.31.2). An agent that reads GET /api/cost-types on a company that has written none sees an empty list, not a missing chart.

The switch

Picking Construction in Settings saves company_type = construction and calls POST /api/construction/setup, which:

  1. creates the contractor accounts below if they are missing,
  2. loads the standard division titles and a set of common sections only when the company has no cost codes of its own (the same list the Cost Codes page's Load standard divisions and common sections button loads), ensuring the labor / material / subcontract / equipment / other cost types first, and
  3. seeds the default trade packages, mapped to the sections just loaded (only when the company has no packages yet).

Setup is idempotent — safe to run again. It never renumbers or renames an account you already have, never touches an existing cost code (a company that has built its own cost-code chart gets no standard codes added), and changes no posting. Switching back to Business leaves the accounts and codes in place (as switching away from Nonprofit leaves its net-asset accounts); they are ordinary accounts once created.

The accounts

Each is created only if an account of that name does not already exist, and each keeps its suggested number only if the chart has not already used it (an imported chart that owns 1150 keeps it; the new account takes no number). Each is pinned to a balance-sheet detail type so it lands on the right line whatever the number-and-name rule would otherwise guess.

NumberNameTypeDetail type
1150Retainage ReceivableAssetOther Current Asset
1350Construction in ProgressAssetOther Current Asset
2050Retainage PayableLiabilityOther Current Liability
2210Customer DepositsLiabilityOther Current Liability
2220Use Tax PayableLiabilityOther Current Liability
5400Equipment CostCOGSCost of Goods Sold
5500Other Job CostsCOGSCost of Goods Sold

Retainage is the portion of a billing held back until a job is accepted — receivable when a customer holds it from you, payable when you hold it from a sub. Construction in Progress carries costs on a job not yet billed. Customer Deposits holds money taken before work. Use Tax Payable is the use tax a contractor self-assesses on materials. Equipment Cost and Other Job Costs are job-cost buckets beside the seed chart's Materials, Labor and Subcontractor Costs.

The cost codes

Codes use the two-level division/section numbering:

Each code carries a level of division, section, or null for a code that isn't division/section shaped. What you type is normalized on save and import: 033000, 03-3000, 03 3000 and 03.30.00 all become 03 30 00. Only a two-digit division or a 6-/8-digit section is reshaped; a code that numbers its own way (L-100, EQ, or a numeric 1000/2000 chart) is left exactly as typed, with a null level, and re-importing it never rewrites it. Everything sorts by code — list, tree, pickers, import result.

The seeded set is the division titles plus a modest set of common sections. The full numbered section catalog isn't ours to publish, so it is not shipped; import your own full list through Import CSV on the Cost Codes page — a CSV of just code,name is enough (a few hundred sections land normalized and auto-parented in one call, each section's division created from the title table if the chart is missing it). Cost type is optional on import and defaults to other.

Trade packages

A trade package (Concrete, Drywall and Ceilings, HVAC, Electrical …) is what a subcontractor bids and gets awarded; a cost-code section is what costs post to. The two are mapped many-to-many — a package can span divisions, and a division can be split across packages. Construction setup seeds a default set of packages mapped to the sections it has; edit them, and the section mapping, under Settings → Trade Packages (shown only for construction companies). Estimate lines, commitments, the schedule of values and the Buyout tab all use them.

Cost type per line

A cost code carries a default cost type, but the type is chosen per line on a budget, estimate, commitment or bill — a 03 30 00 line can post as subcontract on one job and as labor on another. Leave the line's type blank to use the code's default, so existing books are unchanged. The picker shows in construction mode only; a Business or Nonprofit company keeps its line forms as they were and posts the code's type (the API accepts a line type for any company). Job-cost reports read the line's type first and fall back to the code's, and roll a section's cost up under its division.

Estimating

In construction mode the estimate is a bid, not just a priced list (#551). A Business or Nonprofit company's estimate form and PDF are exactly as they were.

Packages and sections. Each line can belong to a trade package — the bid package a sub is awarded (Concrete, Electrical …) — and to a cost-code section (03 30 00), as every costable line does. The package is the bid's view (lines group under it, Unassigned when blank); the section is where the cost posts. A unit of measure (SF, LF, EA, CY…) sits beside the quantity.

Line kinds. A line is one of four:

The lines stay at cost; the markups are their own figures under the subtotal. The subtotal is the sum of the included line amounts — base lines (at cost), accepted alternates and allowances. Beside the subtotal, four percents are figured on the markup base (the base and accepted-alternate lines that carry a unit cost, plus the allowances when that flag is on) and compound in order — each figured on the running total before it. Worked example — a $100,000 cost of work, no allowances, at 8 / 1.5 / 5 / 1 percent:

StepFigured onAmount
Subtotallines at cost100,000.00
General conditions (8%)100,0008,000.00
Insurance (1.5%)108,0001,620.00
Fee (5%)109,6205,481.00
Bond (1%)115,1011,151.01
Bid totalsubtotal + the four116,252.01

The bid total is the subtotal plus the markups, and it is pre-tax: the owner's contract sum and schedule of values (#552) are pre-tax, and tax is added on each invoice. Tax covers the lines and the markups together — the tax rate times the taxable line subtotal plus the markups — when any included line is taxable; an exempt customer pays no tax on anything. The Total is subtotal + markups + tax. The markups are a construction-mode field: a Business or Nonprofit estimate stores 0 for all four whatever an API caller sends, so its totals are the plain Subtotal / Tax / Total.

Markup on allowances is the GC's call, and it is off by default. Each estimate carries a markup_allowances flag (a checkbox under Markups on the form). Off, allowances sit in the subtotal at their amount and the markups skip them. On, the allowance amounts join the markup base, so the four markups are figured on them too (and the budget revenue split follows). The estimate, the form's totals panel, the view and the customer PDF all show "Markup on allowances" as On or Off. The flag freezes with the rest of the price once the estimate is accepted. There is no separate contingency line kind; a contingency carried as an allowance line follows the same flag.

Accept locks the budget. Accepting an estimate (it needs a job) seeds the job budget from the bought scope — a budget row you edited by hand still wins — and then locks the seeded rows: they are the contract budget. The lock is per row: a manual budget row on a code the estimate never touched still saves after acceptance, but a locked row's own key, or re-seeding the whole budget from another estimate, is refused. A job whose budget one estimate locked will not accept a second, and a construction estimate that locked a budget refuses changes to its lines, markups, customer, job, tax and status (its notes and expiration still edit, and a save that resends the same values is not a change; moving status off accepted or converted is refused with a 409, since the next accept would re-seed the locked budget). Business and Nonprofit estimates lock no budget and edit as they always did. There is no unlock — a new estimate or, later, a change order is how a locked budget moves. The customer PDF groups the bid by package with the section code, then blocks the allowances, the alternates not yet taken (at their marked-up price) and unit prices, and foots Subtotal, a row per non-zero markup, Bid total, Tax and Total. The seeded budget distributes the markups across the rows' revenue pro rata to each row's share of the markup base, so the budgeted revenue foots to the bid. A code you budgeted by hand keeps its own row and its own share of the markups; that share is not pushed onto the other rows. General conditions are both revenue and cost: the GC percent stays markup revenue, and on accept the GC amount is also budgeted as a cost on a "GC General Conditions" code (created if the books have none, reused if they do), so the job carries it. That row carries cost only; its revenue is already in the rows above, so it is not counted twice. Insurance, fee and bond are revenue only. Converting an accepted estimate to an invoice drops the unit-price lines and any un-accepted alternate, carries each line's cost type and unit cost onto the invoice, and adds one invoice line per non-zero markup (on the job) so the invoice foots to the bid.

Change orders move the locked budget. A change order (#554, see Change orders below) is how a locked budget moves — a numbered document that revises the contract amount and the budget with an audit trail. Until one is approved, the lock simply holds: the budget stays as the accepted estimate left it.

The contract on the job

An accepted estimate prices the work; the contract is the deal with the owner. A construction job grows a Contract tab (construction mode only; every other company sees the job pages exactly as before) that holds the terms, a few summary tiles and the owner's schedule of values. A job with no contract type set behaves the way it always has — the plain Contract amount on the job form still works for everyone.

The three types. A job's contract is a lump sum (one fixed price), a GMP — guaranteed maximum price (cost-plus up to a ceiling the owner is protected by), or cost-plus (actual cost plus a fee, optionally with a not-to-exceed). The type decides how the fee and the cap read:

The summary stamps the original contract amount once, the first time a sum is set with a type (building from an estimate stamps it too, even when the sum came from the job form). The contract sum and the contingency edit freely (and the original follows the sum) until the job has any billing on the schedule of values or any approved owner change order (a draft or pending one, a potential change order or a sub change order does not lock it, and a void frees it again). From then on the Contract tab and the job form refuse a different sum or contingency (409 contract_sum_locked / contingency_locked), and only an approved change order (#554) moves them, so the tab shows original + changes = revised. Amounts are rounded to the cent and the fee percent must be between 0 and 100. Building from an estimate also copies the estimate's fee markup into the job's fee percent when the job has none, so the fee tile and the SOV fee line agree on a GMP.

The schedule of values. The SOV is the contract sum broken into the lines an owner pay application bills against — each with an item number, a description, an optional package and section, a kind (work, allowance, contingency, or one of the four markups: general conditions, insurance, fee, bond) and a scheduled value. The sum (and the schedule) is pre-tax: sales tax is added on each invoice, not carried in the contract. Build from accepted estimate lays it out automatically: one work line per trade package (its base lines plus any accepted alternates, at cost — the lines carry no markup), an allowance line for each allowance, then one line per non-zero markup in order (general conditions, insurance, fee, bond), each labelled with its percent, and a contingency line when the job carries one. The work, allowance and markup lines foot exactly to the pre-tax bid. Lines with no package roll into one "Unassigned" work line. You can add, remove and reorder rows by hand and edit any value; a value may be negative — a deduct alternate carried onto the schedule nets the sum down. The SOV must balance to the contract sum: a running total and the balance show at the foot of the grid, and the balance stays highlighted until it is zero. When the contract sum came from the estimate (the pre-tax bid, plus any contingency), a freshly built schedule already balances.

Change orders, progress billing and the job reports (below) build on this: change orders revise the contract amount, the budget and the sub commitments together (work paid for out of an allowance carries no markup), progress billing turns the SOV into an owner pay application that holds retainage back and releases it at the end, and the job reports read the lot.

Buyout and commitments

The contract is the money coming in; the buyout is the money going out — what the subs and suppliers are committed to. A commitment is a purchase order (#553). There is no new document type: in construction mode a PO is either a plain purchase order or a subcontract, chosen with a Type select, and it can carry a trade package, a retainage % and scope notes. A subcontract to a vendor not marked a Sub is allowed — the form just notes that its license and insurance aren't tracked; nothing is blocked.

The schedule of values is the lines. A commitment's lines are its schedule of values: each line's amount is its scheduled value, and the commitment bills against those lines a period at a time. Partial billing — To Bill on a commitment opens the usual convert dialog with an amount-this-period column prefilled with each line's remaining (scheduled value less what's already billed). Bill some or all of it: each line tallies its billed-to-date, the commitment reads partial while anything remains and closed once every line is fully billed. A business company's PO bills in one go exactly as before. The dialog takes a bill date, defaulting to today: the bill, its journal entry and the closing-date check all use it, so a progress bill ages from the day it is billed and a later period can still be billed once the PO's own month is closed. (convert-to-bill accepts an optional date; left out, the PO's date is used.) Editing the lines of a converted bill keeps each line tied to its commitment line and re-tallies billed-to-date; a void gives it all back. A line with no price ($0) is not a bill line — the converted bill carries only the lines with money on them (a change from the earlier behaviour, where a description-only line rode along).

Retainage held. When the commitment carries a retainage percent, that percent of each bill's pre-tax subtotal is held back — tax is always payable in full — so the bill credits Accounts Payable for the net and Retainage Payable (2050) for the retainage, its balance due is the net, and the journal still balances with the gross debits. Pay Bills pays only what's owed now, and the A/P aging and vendor balances show the net (the held amount sits on 2050, not A/P). A bill entered by hand can hold retainage the same way. The 2050 line carries the bill's job, so release can find it by job. Editing the lines of a converted bill re-computes the retainage at the commitment's rate on the new subtotal, unless the edit sends retainage_held. A retainage that was set by hand (sent as retainage_held through the API; the bill's retainage_manual is then true) is kept across later edits of the lines, tax or date, while one the commitment's rate derived keeps following that rate even after the rate is changed; it still may not exceed the new subtotal or leave less than has been paid. A fully billed (closed) commitment refuses a higher amount (409): raise it with a sub change order. Release it with Release retainage on the commitment (POST /api/purchase-orders/{id}/release-retainage): a release bill debits 2050 back for the amount released, see Progress billing and retainage below.

Retainage on the cash basis. A bill's held retainage is not an expense on a cash-basis report until it is paid: paying the net spreads that amount over the bill's expense lines, the held part waits on 2050 (which reads zero on the cash Balance Sheet while it waits), and a release of that retainage recognizes the rest of the expense on the day it is paid. Accrual reports are unchanged: the whole bill on its date, the held part on Retainage Payable.

What committed and billed mean now. Committed cost is the remaining open commitment — the scheduled value of every issued, not-yet-closed commitment, less what has been billed — so it keeps meaning "ordered but not yet in the ledger". Beside it the job now carries committed total (the whole of every issued commitment) and billed to date (what has been billed against them), shown as tiles on the job Overview (construction mode) and in the cost-tree totals; the Overview's "Billed to date (subs)" is the sub/supplier side and is distinct from the Contract tab's owner "Billed to date". Both are whole-commitment figures — a commitment has no period — so on a date-ranged cost tree they are all-time (the response flags this with commitments_all_time), unlike the period-scoped actuals beside them.

Bid vs buyout. A Buyout tab on the job (after Contract, construction mode only) pairs each trade package's bid — the accepted estimate's cost for that package — against what has been bought (the commitments tagged to it), with the variance, the committed-remaining, the billed-to-date and the commitments behind each package linked through. Packages bid but not yet bought show with nothing bought; commitments with no package gather under Unassigned. GET /api/jobs/{id}/buyout is the data, and the seam the buyout report and job-cost-by-vendor (#556, see Job reports below) are built on.

Compliance flags. Bills and Pay Bills carry each Sub vendor's paperwork — whether a W-9 is on file and whether the certificate of insurance has expired (or is missing). The Pay Bills rows and the Buyout tab's commitments show a compact flag for a Sub that's short either one, and Pay Bills offers a lien waiver status per bill (not required / pending / conditional / unconditional). A missing W-9 or missing COI is a warning. A Sub whose certificate has expired (by the payment date) is not paid unless the payment is overridden: Pay Bills asks first, saying why, and the payment records that it was paid with an expired COI (coi_override, with a note naming the expiry), shown on the bill's payments and the payment's own view. Through the API, POST /api/bill-payments answers 409 until the request carries coi_override: true. The lien waiver is only a status: saving it works on a bill in a closed period, since it posts nothing.

Sub change orders (see Change orders below) revise a commitment the way owner change orders revise the contract; progress billing (see Progress billing and retainage below) bills a commitment's schedule of values as a sub pay application and releases retainage on both sides; the Buyout Report and Job Cost by Vendor (see Job reports below) read it all.

Change orders

A change order is how a locked budget, its contract and its commitments move, with an audit trail (#554). It comes in three kinds and prices material and labor separately, each carrying its own markup — except work an allowance pays for, which carries none.

The three kinds.

Numbering. Change orders are numbered per job: the job number, then CO-001, CO-002… (PCO-001… for PCOs, SCO-001… for sub change orders), so two jobs each start at CO-001. A job without a job number uses J<id>. Numbers from before this (CO-0001) keep theirs.

Material and labor priced separately, with markup. Each line is a cost type (labor, material, subcontract, equipment, other), a quantity and a unit cost; its cost is quantity × unit cost. The markup that turns cost into the sell price is the line's own percent, else the change order's, else the job's Markup on change orders contract term, else zero. Labor and material each carry their own markup, so the two price independently. Worked example — an owner change order with 10 labor hours at $50 marked up 15% and $1,000 of material marked up 10%: labor sells at 500 × 1.15 = $575.00, material at 1,000 × 1.10 = $1,100.00, a change order total of $1,675.00 on $1,500.00 of cost ($175.00 of markup).

Markup is off by default when an allowance or contingency pays. An owner change order has a funding: contract (it adds to the contract sum), contingency (it draws the owner's contingency down) or allowance (it spends an allowance line, which must be an allowance line on the same job). Allowance- and contingency-funded work carries no markup by default — the sell equals the cost — because the money was already held. The contractor can still mark it up: the change order's Apply markup flag turns it on, and the form, the log (+ markup) and the PDF show whether markup was applied. Switching a change order's funding resets the flag to that funding's default. The same $1,500 of cost funded by an allowance sells at $1,500 unless markup is applied. A marked-up allowance change order draws its sell price from the allowance (as contingency does), and the approve limit checks that figure: $2,000 of cost at 15% draws $2,300. Contract-funded work is always marked up; the flag only governs allowance and contingency work. A markup percent must be above -100% and at most 1000%.

Commitment and budget stay together. A sub change order made from an owner change order writes no budget of its own, so it approves only once that owner change order is approved (409 owner_co_not_approved); an owner change order cannot be rejected or voided while an approved sub change order stands under it (409 approved_sub_co; void the sub CO first). A plain purchase-order edit cannot drop a line a sub change order added or change its amount, quantity, rate, job, cost code or cost type (409 commitment_co_line); a linked sub change order cannot raise commitments past its owner change order: at approve, the cost of the approved sub change orders under it plus this one cannot exceed the owner change order's cost (409 owner_co_budget_exceeded; a rejected or void one does not count), and a sub change order is still refused on a fully billed commitment (409 commitment_not_open).

What approve does. Every effect lands on approve, in one transaction, and reverses on void:

Because the budget key includes the row's source, a change-order budget row sits beside an estimate-locked or manual row on the same code and type — the job-cost tree reads one under Original and the other under Changes.

A change order's figures freeze when it is approved: the cost, sell and the effective markup each line carried are stored, so changing the job's markup or a contract term afterward never moves an approved change order, and void reverses the exact figures it applied.

Void reverses each of these — the contract and SOV line, the budget rows, and the appended commitment lines (exactly the ones it added) — except that a commitment line already billed against cannot be pulled (409 co_billed). The lifecycle is draft → submitted (pending) → approved, with reject and void beside it; a PCO runs draft → pending → promoted (asking to promote rather than approve).

Billed change orders are locked. Once a pay application has billed a change order's schedule-of-values line (#555, below), that change order can no longer be voided — the void answers 409 co_billed, the same guard a sub change order's billed commitment line already carried. The change-order log report (#556, see Job reports below) lists every change order and its effect.

Progress billing and retainage

Progress billing turns the owner's schedule of values into a pay application — the contractor's periodic bill against the contract, the counterpart to a commercial payment application and its line detail (#555). Each application bills a period; approving it creates the invoice.

The application and its math. Every SOV line (work, allowance, contingency and change-order lines all bill the same way) carries, per period:

The application totals read the way the owner's payment application does: completed and stored to date, retainage to date (the sum of the line retainage, net of every release, so it is what is still held), retainage this period (newly withheld), total earned less retainage (completed − retainage to date), less previous payment applications (the prior applications' payment due, before tax), sales tax on this application's billing (below), and the current payment due (total earned less retainage − previous payment applications + tax), then the balance to finish. A release is just retainage going down, so the figures keep lining up with the invoices and account 1150. A deposit applied (below) nets off the current due to the net due.

A worked two-period example with stored materials and a release. A $100,000 contract on two lines, 10% retainage:

ScheduledPreviousThis periodStoredCompletedRetainageCurrent due
App 1100,000030,0005,00035,0003,50031,500
App 2100,00030,00020,0005,00055,0005,50018,000
App 3 (release)100,00050,00005,00055,0000 (5,500 − 5,500 released)5,500

App 1 bills 35,000 of work-and-stored, holds 3,500 of retainage, and certifies $31,500. App 2 bills 20,000 more; retainage to date is now 5,500, so retainage this period is 2,000, and with $31,500 previously certified the current due is $18,000. App 3 does no new work but releases the 5,500 held: no retainage this period, and the current due is the 5,500 released. Across the three, the owner has certified $55,000 and been billed the 5,500 of retainage back.

A release followed by more work: bill 30,000 (10% retainage, 3,000 held, 27,000 due), release 1,500 on the next application (retainage to date 1,500, 1,500 due), then bill 10,000. Retainage to date is 4,000 − 1,500 = 2,500, the application's current due is 9,000, the invoice's balance is 9,000 and account 1150 holds 2,500.

What approve posts. The invoice carries one line per SOV line with a non-zero this-period amount, where the amount is this period plus the change in stored materials — so stored materials are billed the period they are stored and reversed the period they go into the work, and the income billed to date always equals completed-to-date. The journal is DR Accounts Receivable for the net (total − retainage held this period + retainage released), DR Retainage Receivable (1150) for the retainage held, CR 1150 for any released, CR income per line, CR sales tax as any invoice. Sales tax is on by default and can be switched off per application (the Charge tax box); it is charged on the work billed this period at the application's tax rate, defaulted from the job's accepted estimate (kept to six decimals, so 8.875% stays 8.875%) and editable while the application is open. A tax-exempt owner is never taxed. The application shows the tax and its current due includes it, so the application and the invoice match. The invoice's balance due is that net; the invoice view and PDF show Retainage withheld this period, Retainage released and Current payment due. A dropped retainage percent makes the retainage this period negative and the 1150 leg a credit; the entry still balances. Void reverses the invoice (and the 1150 entries), and later applications stay correct because each reads its previous and retainage to date from the approved history live. An application's invoice is voided with the application: voiding it from the Invoices screen is refused (409 invoice_belongs_to_pay_application). Only the latest approved application can be voided (409 later_application otherwise); void the later ones first. Only one application may be open (draft or submitted) per job at a time.

Rules the application keeps. Completed to date and stored never go below zero (or above zero on a deduct line): a negative this-period or stored that would do that is refused (422). An application that only moves stored material into the work has nothing to bill: it is approved with no invoice (current due zero); an application with nothing at all to bill, hold, release, apply or move is still refused. Retainage to date can't go below zero either: a release is refused (422) when it is more than the retainage held at the application's own percent on the work completed, so dropping the percent to 0 and releasing on the same application is refused (release at the held percent, or bill the release on its own application). A lien waiver is for one payment and one job, and its amount is the part of the payment applied to that job's invoices. At approval the application keeps the contract sums as they stood (original, and to date with change orders), and its PDF prints those, not today's job. An invoice made from a payment application can't be edited on the Invoices screen except for its notes (409); change the application instead.

Owner deposits. Money an owner pays ahead of the work is a deposit (Pay apps tab → Owner deposits, or POST /api/jobs/{id}/deposits): it posts DR the bank / CR Customer Deposits (2210) and shows as received, applied and unapplied. A pay application's deposit applied draws the unapplied balance down — on approve a payment whose deposit-to account is 2210 is created and applied to the invoice (DR 2210 / CR A/R), so the owner's prepayment settles the current due. Voiding the application restores the deposit — the deposit payment, the invoice and the application are voided together, so a refusal (a payment still on the invoice, the closing date) leaves all three standing. A deposit that has been applied cannot be voided until the application is, and the deposit payment cannot be voided from Payments while the application stands (409).

The sub side. A commitment bills a period at a time exactly as buyout described (the Sub pay app button opens the partial-convert dialog with previous / this period / remaining). Its held retainage is released with Release retainage (POST /api/purchase-orders/{id}/release-retainage), which writes a bill for the vendor carrying no expense account: DR Retainage Payable (2050) / CR Accounts Payable for the amount, payable through Pay Bills like any bill. A release over what is held is refused (422), and voiding the release bill gives the retainage back to the commitment. Retainage is held and released this way on both sides — 1150 receivable on the owner side, 2050 payable on the sub side.

Lien waivers. On the sub side a bill carries its lien-waiver status (not required / pending / conditional / unconditional), as it has since buyout; the commitment's pay-app schedule lists its bills with that status. On the owner side, a pay application warns — it never blocks — about the job's sub bills dated on or before the period whose waiver is still missing or pending, so the GC sees what to collect before submitting.

On the owner side, each payment received on a payment application's invoice can carry the full set of waivers the contractor gives the owner: conditional progress, unconditional progress, conditional final and unconditional final (Pay apps tab → Waivers, or POST /api/lien-waivers with payment_id, waiver_type and, when the payment pays more than one job's invoices, the job_id it is for — left out, a payment on one job needs no job_id, and one spanning two jobs is refused with 400 job_required naming them). One of each type per payment and job; the waiver takes the part of the payment applied to that job's invoices and a through date (the application's period, else the payment's date), and GET /api/lien-waivers/{id}/pdf prints it. A conditional waiver takes effect only once the payment is received; an unconditional one says it has been; a final one covers the whole job. Some states require their own waiver form, so check yours before relying on these.

The schedule is now anchored. Once an approved application has billed the schedule of values, it can no longer be rebuilt from the estimate (409 sov_has_billings), a line cannot be dropped or shrunk below what it has billed (422), and a billed change order cannot be voided (409 co_billed). New lines can still be added.

The job reports read these figures. The WIP schedule, cost-to-complete, the change-order log, the buyout report and job cost by vendor (#556, see Job reports below) are built on the contract, the cost tree, the commitments, the change orders and the pay applications above.

Job reports

Seven reports sit on the Report Center for a construction company (its first cards, after the three job reports every company has; a Business or Nonprofit company never sees them), each a plain grid with a JSON route, a PDF and a CSV like P&L by Job. Each takes an as_of date (or start_date/end_date where a period applies) and optional job_id, customer_id, status and include_closed; by default closed and not-awarded jobs are left out.

WIP schedule (wip-schedule). The work-in-progress schedule lists every job with a contract — contract sum, approved change orders, revised contract, estimated total cost and gross profit, cost to date, percent complete, earned revenue, billed to date, over and under billing, retainage outstanding, cost to complete, projected gross profit, projected loss and loss provision; a job with no contract terms is listed with blanks. It is cost-to-cost: percent complete is cost to date ÷ estimated total cost (capped at 100%), earned revenue is the revised contract times that percent, and over billing (billed − earned, a liability — billings in excess of costs and estimated earnings) or under billing (earned − billed, an asset — costs and estimated earnings in excess of billings) is the difference. The estimated total cost is actual cost plus the cost-to-complete forecast (below), so a job past its budget with work still to do reads under 100%; with no forecast entered the default is budget − actual per cell, floored at zero, and a job with no budget and no forecast has nothing to measure against, so it earns nothing: it is listed with a warning ("no budget or forecast; nothing earned"); its contract, cost to date, billed to date and retainage count in the totals, but its earned revenue, over/under billing and loss provision are left out, and so is it from the adjusting entry, until its cost to date reaches the contract (then it reads 100% complete, and the loss is the true loss, with no extra provision). Every figure reads as of the date: cost to date and posted revenue to that day, billing and retainage from the applications approved by then, and the revised contract with the change orders approved by then (so the schedule reproduces the books on an earlier close). Billed to date is the sum of the approved pay applications' completed-to-date when the job has one by the date (else the posted revenue carrying the job — the billed_basis column says which).

Projected loss. When actual + cost to complete is over the revised contract, the whole loss is recognised now, the usual treatment of a loss contract. Earned revenue at the percent complete already carries percent × loss, so the loss provision is the rest: loss × (1 − percent). Example: contract 100,000, cost to date 60,000, 60,000 still to spend — projected cost 120,000, loss 20,000, 50% complete, 50,000 earned (so 10,000 of the loss is already in), provision 10,000.

The adjusting entry (adjusting_entry in the JSON, a second grid in the PDF, a block under the grid in the CSV and a table on screen). Per job and net, with amounts:

linedebitcredit
Costs and Estimated Earnings in Excess of Billings (under-billing, asset)under
Billings in Excess of Costs and Estimated Earnings (over-billing, liability)over
Contract Revenue (WIP adjustment)over − under when over is largerunder − over when under is larger
Loss on Uncompleted Contracts (expense)provision
Provision for Loss on Uncompleted Contracts (liability)provision

The entry balances. These are the balances to carry as of the date; if an earlier WIP entry was posted, reverse it first or post only the difference. The report posts nothing — there is no post button; the entry is for the accountant to journal.

Cost-to-complete forecast (cost-to-complete-forecast). A per-job table of section × cost type: budget, actual (to the date), the default cost to complete (budget − actual, floored at zero), the amount you entered, the cost to complete that counts, and the projected final. A sub-code rolls up to its section; budget and cost with no code share one Unassigned cell. Type an amount in the Report Center table (or PUT /api/jobs/{id}/cost-to-complete-forecast with {"entries": [{"cost_code_id", "cost_type", "amount"}]}; null clears a cell back to its default). Entries are stored in job_cost_to_complete and are job-to-date, not dated: a WIP schedule run back-dated (a year-end run in February) stops actuals at the date but uses today's typed amount, so percent complete can read high, and the JSON carries a warnings entry when the amount was entered after the as-of date. The older Cost to complete report defines cost to complete as remaining budget plus open commitments, which differs from this forecast, so the two can show different figures for the same job. PDF and CSV like the other reports.

Commitment status (commitment-status). Each commitment (PO or subcontract, not a draft, dated by as_of) per job: committed (pre-tax value), billed to date (bills dated by then; a retainage-release bill pays money already billed and is not counted), retainage held (held less released) and remaining (committed less billed, open commitments only), with totals per job and grand. Committed leaves out lines added by a sub change order approved after the date. A closed commitment counts closed on every date, unless a bill against it is dated after the date: then it was still open on it, and remaining is committed less billed by then. PDF and CSV.

Cost to complete (cost-to-complete). Per job, per cost code (division › section), with budget revised, committed (remaining), actual, cost to complete (the remaining budget plus open commitments), projected final (actual + cost to complete), variance to budget and percent complete by cost, with totals per job and grand totals. The totals foot the rows — cost to complete, projected and variance are the sum of the clamped per-code figures (Σ max(…) ≠ max(Σ …) once a code runs over), budget/committed/actual the raw sums. The JSON keeps the cost-code tree (children); the PDF and CSV flatten it with the code path.

Change order log (change-order-log). Every change order per job — number, kind, status, title, date, funding, cost, markup, sell, approved and voided dates, source PCO and (for a sub CO) its commitment — with the running approved total (the change orders approved by as_of) and the contract it builds (original + approved changes = revised), the pending total (as of today) and counts by status.

Buyout report (buyout). The job buyout across jobs: each trade package's bid cost against what has been bought, with the variance, committed-remaining and billed-to-date and the commitments behind each, the Unassigned row kept, totals per job and grand. As of as_of, only commitments dated by then count and billed-to-date is the non-void bills dated by then.

Job cost by vendor (job-cost-by-vendor). Posted job cost grouped job → vendor (the transaction header's vendor; a No vendor bucket holds journals and job cost entries), with each vendor's bills, paid to date (the bill payments allocated to that vendor's bills on the job), retainage held outstanding (held − released on those bills) and open A/P. The cost is for the period; the bill figures are job-to-date and prorated by the job's share of each bill's line amounts — a header-only bill counts whole, a bill split across jobs splits its payment, retainage, A/P and count — so a job's bills can read fractional.

The existing Job Profitability and Job Budget vs Actual reports gained PDF and CSV routes, so every contractor report exports the same way.

The words

A contractor keeps almost every business word — Customer, Invoice, Estimate, Job all stay, as they do in QuickBooks' Contractor Edition. The one that changes is Subcontractor → Sub, on screens and in prose. Nothing in the API, the database or the export formats changes name.

Customer:Job in QuickBooks prints with no space around the colon; SlowBooks prints "Customer: Job" (with a space) everywhere today, and that is left unchanged in Phase 2 — see What this mode does not do yet.

The subcontractor vendor type

A vendor can be marked a Sub (the UI word; vendor_type is "sub", its only value for now — a Subcontractor). A sub carries:

These fields are blank on an ordinary vendor and reveal only when the vendor is marked a sub; un-marking a sub clears the license and COI fields but leaves the 1099 answer as it is. 1099 is off by default for every new vendor — a lumber yard or the power company is not reportable. The first time a vendor is marked a Sub, 1099-NEC turns on (a sub's labor is reportable); you can change it afterward, and a sub already set to 1099-MISC keeps it. W-9 on file is a fact you record, not a default, so it stays No.

The reports

In construction mode the Report Center's first ten cards are the three job reports that always existed — Job Profitability, Job Budget vs Actual and P&L by Job — then the seven construction reports: WIP Schedule, Cost to Complete, Change Order Log, Buyout Report, Job Cost by Vendor, Cost-to-Complete Forecast and Commitment Status (see Job reports above). The seven show in construction mode only. Every other report stays where it is.

What this mode does not do yet